OEE INDEX 87.4% ▲ +2.1% vs target
PT Sumber Mas Autorindo
SMA Digital Floor · v1.0.0

Monitor your production
floor in real-time

⚙️
Active Lines
5 /6
OEE 87.4%
⚠️
Active Alerts
2
PRS-03 maint due
📡
Live Sensors
842
Real-time streams
SMA Plant · Tangerang · Line A, B, C Active
Secure Access

Welcome back

Sign in ke SMA Digital Floor untuk memantau
lini produksi PT Sumber Mas Autorindo.

Operator
Supervisor
Engineer
Manager
or
© 2025 PT Sumber Mas Autorindo v1.0.0
WebGL · Three.js · SMA Production Floor · Shift B
ST-4 Wire Harness — BOTTLENECK 🔴 CT 69s
Overall OEE
87.4%
Target 85.0%
Availability
94.2%
5 of 6 lines
Performance
91.8%
vs target 90%
Quality
98.2%
Defect rate 1.8%
Alerts
2
No critical
Three.js WebGL · Live Render
Klik workbench atau operator untuk Floor Report
Drag orbit · Scroll zoom
3D Factory Floor · SMA Production Floor · Line 1 · Setup 665B · 5 Stations
🤖
ELMO AI
Production Intelligence · SMA
Online
Shift B · 14:00
🤖
✦ ELMO AI
Selamat datang di SMA Digital Floor 3D. Klik workbench atau operator di scene 3D untuk Floor Report per station.

🔴 PRIORITY — ST-4 BOTTLENECK
Wire Harness CT 69s vs takt 40s. 5 defects this shift. Switch ke Auto Tester sekarang — 3 unit tersedia.
Line 1 OEE 78.4% — di bawah target 85%.
📊
OEE Status
Machine health cards, availability matrix,
performance per line — OEE deep-dive view.
COMING · PART 2
👷
Operator View
Simplified mobile-optimized view for floor operators,
task list, machine assignments, SOP access.
COMING · PART 2
🔍
Traceability
Product tracking, genealogy, batch history,
quality trace per serial / batch number.
COMING · PART 2
Floor Context
Real-time data · Shift 1 · 08:31 WIB
Live Alerts
L1-ST4 Wire Harness
CT 69s 🔴
Bottleneck — 29s over takt
L2-ST3 Unmanned
0 Operator 😷
Rudi S. ijin sakit
Line 2 OEE Rendah
63.1% ⚠
Target 85%
Quick Actions
Action Log
Shift Report digenerate & dikirim
07:00 WIB
✓ Delivered to +62811xxxx
Alert: L2-ST3 Unmanned terdeteksi
07:05 WIB
⚠ Notifikasi dikirim ke SPV
Bottleneck WH — Alert Level 3
07:30 WIB
🔴 Escalated ke Plant Manager
ELMO Hero AI
DSS · Real-time Floor Intelligence · Action Mode
Floor Monitor Action Executor Predictive RAG Indexed
📊 Status semua line ⚡ Solusi WH bottleneck ⭐ Best performer 💰 Production loss ⏱️ Overtime request
ELMO Hero AI Capabilities
DSS · Decision Support System
Monitor & Analyze
📡
Real-time Floor Monitor
OEE, CT, defect rate semua station live
📊
KPI Analysis
Analisis trend, pattern, dan anomali
🔮
Predictive Analytics
Prediksi bottleneck & failure 30–120 menit ke depan
Take Action
Switch Auto Mode
Aktifkan/matikan auto tester per station via perintah chat
👷
Operator Assignment
Assign, reassign, atau recommend operator coverage
📢
Notify & Escalate
Kirim notifikasi WhatsApp, email, atau Andon board
📋
Auto Report
Generate shift report, quality report, operator report
Knowledge Base
📚
SOP & Manual
Jawab pertanyaan berdasarkan dokumen SOP yang diindeks
🔧
Maintenance Guide
Panduan troubleshooting dan preventive maintenance
📈
Historical Analysis
Bandingkan performa dengan shift/minggu sebelumnya
Integration
🔗
SAP / MES Connected
Pull data work order dan production plan real-time
💬
WhatsApp Push
Kirim laporan dan alert ke nomor supervisor / manager
🔮
Predictive Maintenance
ML-based failure prediction, RUL estimation,
maintenance schedule optimizer, risk scoring.
COMING · PART 3
Production Lines — Change Station
SMA Digital Floor · Shift B · klik baris untuk pindah ke line tersebut di 3D
Overall OEE
87.4%
Target 85.0%
Availability
94.2%
5 of 6 lines
Output
2,841
Target 3,200
Alerts
2
No critical
Line Machines OEE % Output
Klik baris line untuk membuka tampilan 3D Main Floor line tersebut
ST-1 · ECU Checker
Budi Santoso
⚠️
Warning